[Construction Example] Heat-insulated temporary toilets, expected to maintain temperature during winter.
This is a construction case study.
Originally, the Sky Sheet is used as a sky method installed on top of a corrugated roof, but in some cases, it is used differently, so we would like to introduce such an example.
Building usage: Temporary toilet heat insulation at a construction site
Construction site: Shizuoka Prefecture
Product used: Thermo Barrier Sky
Installation location: Two-unit temporary toilet
Construction period: August 2022
Construction days: 0.5 days
It was installed as a heat countermeasure for a temporary toilet at a site office with a construction period of about 8 months. Since it is a rental item, caulking was not used; instead, the overlapping parts were made larger to prevent water intrusion, and finished with glass cloth aluminum tape. In addition to heat countermeasures, we also expect benefits during the winter.